Which type of quote do you require?

Use the below table as a guide on what information you need to submit for the type of quote you require

 

 

Is the total recon cost under £25m?

Is total recon cost over £25m across multiple structures with no one structure having a reconstruction value of £25m or more? (podium blocks class as one structure) 

Is the total recon cost over £25m with one continuous structure? (podium blocks class as one structure)

Quote Type

You need to complete…

You need to complete…

You need to complete…

Very rough indication (VRI)

Start indication >

  • Address Of site
  • Total Reconstruction Cost
  • Total Sales Value
  • Type Of Unit
  • New Build or Conversion
  • Name of Contractor or tender list
  • Address Of site
  • Total Reconstruction Cost
  • Total Sales Value
  • Type Of Unit
  • New Build or Conversion
  • Name of Contractor or tender list
  • Section 1 of the Proforma
  • Name Of Contractor or tender list

More accurate indication

Start indication >

  All the above plus:

  • Plot Matrix

  All the above plus:

  • Plot Matrix

  As above

Binding Quote

Start quote >

  • Application
  • Plot matrix
  • Application
  • Plot matrix
  • Site plan showing that structures are separate
  • Application
  • Plot matrix
  • Proforma
  • Design and accesses statement (RIBA 2)
  • Structural engineering philosophy

 

Before you complete your quote or indication request …

Download and attach your plot matrix and proforma (if required) to your application below.

Download Plot Matrix ↓ Download Proforma ↓

 

Request an Indication

 

 

Request a binding quote



Complete the online application to receive a full quote.

Complete Application Form

 

Request a call back



Request a call back from your Account Manager

Request a Call Back