Which type of quote do you require?
Use the below table as a guide on what information you need to submit for the type of quote you require
|
Is the total recon cost under £25m? |
Is total recon cost over £25m across multiple structures with no one structure having a reconstruction value of £25m or more? (podium blocks class as one structure) |
Is the total recon cost over £25m with one continuous structure? (podium blocks class as one structure) |
Quote Type |
You need to complete… |
You need to complete… |
You need to complete… |
Very rough indication (VRI) |
|
|
|
More accurate indication |
All the above plus:
|
All the above plus:
|
As above |
Binding Quote |
|
|
|
Before you complete your quote or indication request …
Download and attach your plot matrix and proforma (if required) to your application below.